Section 5 Section 5-1 Section 5-2 Section 5-3 Section 5-4 Section 5-5 Section 5-6 Section 5-7 Section 5-8 Section 5-9

Section 5 - College Parkway / McGregor Blvd. Intersection

This is the end of the project, which is the intersection of Cape Coral Parkway and McGregor Blvd. Major improvements include converting the exclusive eastbound right-turn lane to a free-flow lane with the addition of a receiving acceleration lane along southbound McGregor Blvd south of College Parkway. The inside eastbound lane is converted from a shared left-turn through right-turn lane to a shared left-turn and through lane.   

Image description goes here.

Image description goes here.

Image description goes here.

Typical Section

Typical Section McGregor